Footprint Reduction Strategy
From 2009 - 2011
-
Accelerated
-
Completion by 2011
Goals
- Reduce operational footprint over 50% by 2011
M Area
- Complete area closure
- Small Arms Training Area remediation
B Area
- 710 1B building facility demolition
- Decommission of Heavy Water Components Test Reactor (HWCTR)
- Waste storage area closure
E Area
- 5,000 m3 transuranic waste shipped or ready to be shipped by 2012
- 5 low-level waste trenches closure
F and N Areas
- Ship 16,000 drums of depleted uranium oxide
D Area
- Complete area closure
K Area
- Cooling tower D&D
P and R Areas
- Decommission P and R reactors
- Close P and R ash basins
- Complete remedial actions at P and R units