SRS Specific NEPA Documents |
DOCUMENT NUMBER |
TITLE |
DATE |
OPEN FOR COMMENT
|
DOE/EA-0826 |
ENVIRONMENTAL ASSESSMENT NATURAL RESOURCE MANAGEMENT ACTIVITIES AT THE SAVANNAH RIVER SITE |
07/1993 |
Final Document
Comment Period Closed |
Revised Finding of No Significant Impact
for the
Natural Resource Management Activities
at the Savannah River Site |
04/2005 |
Final Document
Comment Period Closed |
DOE/EA-0878 |
Centralization and Upgrading of the Sanitary Wastewater System at the Savannah River Site, September 1993 |
09/1993 |
Final Document
Comment Period Closed |
DOE/EA-0943 |
FONSI and Environmental Assessment for the Domestic Water Supply Upgrades and Consolidation of the Savannah River Site |
06/1994 |
Final Document
Comment Period Closed |
DOE/EA-1205 |
ENVIRONMENTAL ASSESSMENT
FOR THE
IMPLEMENTATION OF THE
WETLAND MITIGATION BANK PROGRAM
AT THE
SAVANNAH RIVER SITE |
04/1999 |
Final Document
Comment Period Closed |
Finding of No Significant Impact
and
Floodplain Statement of Findings
for the
Implementation of the Wetland Mitigation Bank Program
at the Savannah River Site |
04/1999 |
Final Document
Comment Period Closed |
DOE/EIS-0220-SA-02
and
DOE/EIS-0279-SA-06 |
Supplement Analysis of the Mark-18A Target Material Recovery Program at the Savannah River Site |
12/09/2016 |
Final Document
N/A |
Amended Record of Decision |
03/08/2018 |
N/A |
DOE EIS-0220-
SA-1 |
Supplement Analysis Interim Management of Nuclear Materials Final Environmental Impact |
09/25/2009 |
Final Document
Comment Period Closed |
-- |
Revised FONSI for the Natural Fluctuation of Water Level in Par Pond and Reduced Water Flow in Steel Creek |
01/29/2009 |
N/A |
DOE/EA-1322 |
Environmental Assessment for the Construction and Operation of the Highly Enriched Uranium Blend-Down Facilities at the Savannah River Site |
11/2000 |
Final Document Comment Period Closed |
DOE/EA-1501 |
Construction,
Operation and Closure of the Burma Road II Borrow Pit
at the Savannah River Site |
07/2004 |
Final Document Comment Period Closed |
DOE/EA-1513 |
National
Pollutant discharge Elimination System Wastewater Compliance
Alternatives at the Savannah River Site |
04/2005 |
Final Document Comment Period Closed |
DOE/EA-1528 |
Storage
of Tritium-Producing Burnable Absorber Rods in K-Area
Transfer Bay at the Savannah River Site |
06/2005 |
Final Document Comment Period Closed |
DOE/EA-1538 |
Environmental
Assessment for the Safeguards and Security Upgrades
for Storage of Plutonium Materials at the Savannah River
Site |
12/2005 |
Final Document Comment Period Closed |
DOE/EA-1538
FONSI |
Revised Finding of No Significant Impact for Safeguards and Security Upgrades
for Storage of Plutonium Materials at the Savannah River
Site |
03/2008 |
Final Document Comment Period Closed |
DOE/EA-1538
FONSI-Rev.1 |
Revised Finding of No Significant Impact for Safeguards and Security Upgrades
for Storage of Plutonium Materials at the Savannah River
Site |
07/2010 |
Final Document Comment Period Closed |
DOE/EA-1563 |
Environmental
Assessment for the National Pollutant Discharge Elimination
System Stormwater Compliance Alternatives at the Savannah
River Site |
06/2007 |
Final Document Comment Period Closed |
DOE/EA-1568 |
Environmental
Assessment for the Replacement Source of Steam for A
Area at the Savannah River Site |
10/2006 |
Final Document Comment Period Closed |
DOE/EA-1605
& FONSI |
Environmental
Assessment for Biomass Cogeneration and Heating Facilities
at the Savannah River Site |
08/2008 |
Final Document Comment Period Closed |
Revised FONSI for Biomass Cogeneration and Heating Facilities at the Savannah River Site |
06/2015 |
Final Document Comment Period Closed |
DOE/EA-1606
& FONSI |
Environmental Assessment for the Proposed Use of Savannah River Site Lands for Military Training |
12/2011 |
Final Document
Comment Period Closed |
Revised FONSI - Proposed Use of Savannah River Site Lands for Military Training |
07/26/2012 |
Final Document Comment Period Closed |
DOE/EA-2115 |
Draft Commercial Disposal of Defense Waste Processing Facility Recycle Wastewater from Savannah River Site |
12/2019 |
Final Document
Comment Period Closed |
Final Commercial Disposal of Defense Waste Processing Facility Recycle Wastewater from the Savannah River Site |
08/2020 |
Finding of No Significant Impact for Final Commercial Disposal of Defense Waste Processing Facility Recycle Wastewater from the Savannah River Site |
08/04/2020 |
RETURN TO TOP |
DOE/EIS-0082 |
Defense Waste Processing Facility, Savannah River Plant |
02/1982 |
Final Document
Comment Period Closed |
Record of Decision |
06/1982 |
DOE/EIS-0082-S1 |
Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) |
11/1994 |
Final Document
Comment Period Closed |
Record of Decision |
04/1995 |
|
Supplement
Analysis - Salt Processing Alternatives at the Savannah
River Site |
01/2006 |
Final Document Comment Period Closed |
DOE/EIS-0303 |
Savannah
River Site High-Level Waste Tank Closure Final Environmental
Impact Statement |
05/2002 |
Final Document Comment Period Closed |
DOE/EIS-0303-SA-01 |
High-Level Waste Tank Closure Final Environmental
Impact Statement for the Savannah River Site - Supplement Analysis |
03/2012 |
Final Document Comment Period Closed |
DOE/EIS-0303-SA-02 |
High-Level Waste Tank Closure Final Environmental
Impact Statement for the Savannah River Site - Supplement Analysis |
08/2014 |
Final Document Comment Period Closed |
DOE/EA-1308
& FONSI |
Environmental Assessment for the Offsite Transportation of Certain Low-Level and Mixed Radioactive Waste from the Savannah River Site for Treatment and Disposal at Commercial and Government Facilities |
02/2001 |
Final Document Comment Period Closed |
SPD SEIS, DOE/EIS-0283-S2 |
Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS) Interim Action Determination, Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the SRS.
|
12/8/2008 |
Final Document Comment Period Closed |
Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS), Interim Action Determination, Processing of Plutonium Materials in H-Canyon at the SRS |
9/25/2009 |
Final Document Comment Period Closed |
Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS) Amended Interim Action Determination, Dispostion of Plutonium Materials from DOE Standard 3013 Surveillance Program at the Savannah River Site |
3/30/2011 |
Final Document Comment Period Closed |
Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS) Interim Action Determination Flexible Manufacturing Capability for the Mixed Fuel Fabrication Facility (MFFF) |
04/01/2011 |
Final Document Comment Period Closed |
Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS) Interim Action Determination, Disposition of Certain Plutonium Materials Stored at the SRS |
10/17/2011 |
Final Document Comment Period Closed |
Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS) Amended Interim Action Determination, Disposition of Certain Plutonium Materials at the K-Area Complex, Savannah River Site. |
11/07/13 |
Final Document Comment Period Closed |
Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS) Interim Action Determination, Use of H-Canyon/HB-Line to Prepare Feed for the Mixed Oxide Fuel Fabrication Facility at the Savannah River Site |
06/26/2012 |
Final Document Comment Period Closed |
Draft Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD Supplemental EIS) (DOE/EIS-0283-S2) |
07/2012 |
Final Document Comment Period Closed |
|
Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS) Interim Action Determination, K-Area Materials Storage (KAMS) Area Expansion at the Savannah River Site |
04/25/2013 |
Final Document Comment Period Closed |
Final Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS) |
04/2015 |
Final Document Comment Period Closed |
|
Final Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS) - Notice of Preferred Alternative |
12/24/2015 |
Final Document
Comment Period Closed |
Supplement Analysis for the Disposition of Fast Critical Assembly Plutonium |
01/2021 |
Final Document N/A |
Amended Record of Decision |
03/08/2021 |
Final Document |
DOE/EIS-0549 |
Notice of Availability of Draft Environmental Impact Statement for Surplus Plutonium Disposition Program |
12/16/2022 |
Comment Period 12/16/2022-2/14/2023 |
|
RETURN TO TOP |
DOE/EIS-0283-SA-03 |
Transportation of Depleted Uranium Hexafluoride for Conversion to Depleted Uranium Oxide |
08/27/2012 |
Final Document Comment Period Closed |
DOE/EIS-0283-SA-04 |
Supplement Analysis for Disposition of Additional Non-Pit Surplus Plutonium |
08/2020 |
Final Document
Comment Period Closed |
Amended Record of Decision |
DOE/EIS-0203
(SNF PEIS) |
Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programmatic Environmental Impact Statement |
04/1995 |
Final Document Comment Period Closed |
|
DOE/EIS-0218 (FRR EIS) |
Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel |
02/1996 |
Final Document Comment Period Closed |
|
DOE/EIS-0279 (SRS SNF EIS) |
Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement |
03/2000 |
Final Document Comment Period Closed |
|
DOE/EIS-0279-SA-01
and
DOE/EIS-0218-SA-06 |
Supplement Analysis – Savannah River Site Spent Nuclear Fuel Management |
03/2013 |
Final Document Comment Period Closed |
Record of Decision |
DOE/EIS-0279-SA-07 |
Supplement Analysis |
04/2022 |
Final Document
Comment Period Closed |
Amended Record of Decision |
DOE/EIS-0218-SA-07 |
Supplement Analysis for the Foreign Research Reactor Spent Nuclear Fuel Acceptance Program |
11/2015 |
Final Document
Comment Period Closed |
-- |
Complex Transformation SPEIS |
|
N/A |
Amended Record of Decision |
DOE/EIS-0218-SA-08 |
Supplement Analysis for the Foreign Research Reactor Spent Nuclear Fuel Acceptance Program |
04/2019 |
Final Document
Comment Period Closed |
DOE/EIS-0423 |
Long-Term Management and Storage of Elemental Mercury Final Environmental Impact Statement |
01/2011 |
Final Document
Comment Period Closed |
Summary |
Volume 1 |
Volume 2 |
DOE/EIS-0423-S1 |
Supplemental Environmental Impact Statement for Long-Term Management and Storage of Elemental Mercury |
09/2013 |
Final Document
Comment Period Closed |
Summary |
Final EIS |
|
DOE/EIS-0423-S2 |
Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury |
02/2024 |
Final Document
Comment Period Closed |
DOE/EIS-0524 |
Final Environmental Impact Statement for the Disposal of Decommissioned, Defueled Ex-Enterprise (CVN 65) and Its Associated Naval Reactor Plants |
06/2023 |
Final Document
Comment Period Closed |
Record of Decision |
DOE/EIS-0541 |
Plutonium Pit Production at Savannah River Site Final Environmental Impact Statement |
Final Document
Comment Period Closed |
09/25/20 |
|
DOE/EIS-0542 |
Versatile Test Reactor Final Environmental Impact Statement |
05/2022 |
Final Document
Comment Period Closed |
Record of Decision
|
DOE/EIS-0549 |
Surplus Plutonium Disposition Program Final Environmental Impact Statement |
12/2023 |
Final Document
Comment Period Closed
|
DOE/EA-1977 |
Federal Register Notice of Availability for Draft Spent Nuclear Fuel from Germany EA and Public Meeting |
01/25/2016 |
N/A |
Draft Environmental Assessment for the Acceptance and Disposition of Spent Nuclear Fuel Containing U.S.-Origin Highly Enriched Uranium From The Federal Republic Of Germany |
01/2016 |
Final Document
Comment Period Closed |
Final Environmental Assessment for the Acceptance and Disposition of Spent Nuclear Fuel Containing U.S.-Origin Highly Enriched Uranium from the Federal Republic of Germany |
12/2017 |
Final Document
Comment Period Closed |
|
DOE/EA-2024
& FONSI |
Environmental Assessment for Gap Material Plutonium – Transport, Receipt, and Processing |
12/2015 |
Final Document
Comment Period Closed |
Finding of No Significant Impact for the Environmental Assessment for Gap Material Plutonium – Transport, Receipt, and Processing |
12/28/2015 |
SRNS-J2210-2017-00093, Rev. 1 |
Floodplain and Wetland Assessment of the Effects of Proposed Herbicide Application to Utility Rights-of-Way on the Savannah River Site |
01/2018 |
Final Document
Comment Period Closed
|
SRNS-J2000-2019-00159, Rev. 0 |
Floodplain and Wetland Assessment of the Effects of Proposed Herbicide Application at Environmental Sampling Locations on the Savannah River Site |
01/2020 |
Final Document
Comment Period Closed |
SRNS-J2200-2020-00101, Rev. 0 |
Floodplain Statement of Findings for the Effects of Proposed Herbicide Application at Environmental Sampling Locations on the Savannah River Site |
04/2020 |
Final Document N/A |
SRNS-J2210-2018-00197, Rev. 0 |
Floodplain and Wetland Assessment of the Effects of Herbicide Application to Dominion Energy Electricity Rights-of-way on the Savannah River Site |
03/2020 |
Final Document N/A |
SRNS-J2210-2020-00144, Rev. 0 |
Floodplain Statement of Findings for the Effects of Proposed Herbicide Application to Dominion Energy Electricity Rights-of-way on the Savannah River Site |
05/2020 |
Final Document N/A |
SRNS-J2000-2019-00100, Rev. 0 |
Floodplain and Wetland Assessment of the Effects of Herbicide Application to DOE-SR 115-kV Electricity Transmission Line Rights-of-way on the Savannah River Site |
03/2020 |
Final Document N/A |
SRNS-J2200-2020-00143 Rev. 0 |
Floodplain Statement of Findings or the Effects of Proposed Herbicide Application to DOE-SR 115-kV Electricity Transmission Line Rights-of-way on the Savannah River Site |
05/2020 |
Final Document N/A |
DOE/EA-2115 |
Commercial Disposal of Defense Waste Processing Facility Recycle Wastewater From The Savannah River Site |
08/2020 |
Final Document N/A |
Finding of No Significant Impact for the Commercial Disposal of Defense Waste Processing Facility Recycle Wastewater From The Savannah River Site |
DOE/EA-2151
& FONSI |
Final Environmental Assessment for the Tritium Finishing Facility at
the Savannah River Site |
03/2020 |
Final Document N/A |
Finding of No Significant Impact for the Tritium Finishing Facility at
the Savannah River Site |
DOE/EA-2154
& FONSI |
Final Environmental Assessment for the Commercial Disposal of Savannah River Site Contaminated Process Equipment |
07/2023 |
Final Document N/A |
Finding of No Significant Impact for the Commercial Disposal of Savannah River Site Contaminated Process Equipment |
07/2023 |
DOE/EA-2243 |
Adoption of Environmental Assessment and Issuance of a Finding of No Significant Impact Feral Swine Damage Management in South Carolina |
01/2024 |
Final Document N/A |
SRNS-RP-2023-00155, Rev. 0 |
Savannah River Site Floodplain and Wetland Assessment for the Installation of a Fiber Optic Cable from U.S. Forest Service - Savannah River Headquarters Advanced Tactical Training Area at SRS |
03/2023 |
Available for Public Comment |
DOE/EIS-0288-S1 |
Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor |
02/2016 |
Final Document
Comment Period Closed |
Record of Decision |
06/2016 |
Amended Record of Decision |
09/2023 |
DOE/EIS-0573 |
Notice of Intent to Prepare a Programmatic Environmental Impact Statement for Plutonium Pit Production |
05/09/2025 |
Comment Period Closes 07/14/2025 |
DOE/EIS-0240-SA-02 and
DOE/EIS 0279-SA-08 |
Supplement Analysis for Highly Enriched Uranium Blend Down to High-Assay Low-Enriched Uranium at the Savannah River Site |
04/2025 |
Final Document N/A |
Amended Record of Decision for Highly Enriched Uranium Blend Down to High-Assay Low-Enriched Uranium at the Savannah River Site |
04/2025 |
Final Document N/A |
RETURN TO TOP |